Upgrade of air-conditioning systems in the electrical rooms

An upgrade was performed in 2016 of the air-conditioning system in the electrical rooms. The electrical rooms contain expensive equipment that is sensitive to high temperature. Consequently, new air-conditioners were purchased and existing air-conditioners were refurbished. Redundancy has been provided so that when one air-conditioning unit is off-line, another unit is available for backup. Following refurbishment, a serviceable temperature of 24°C has been achieved in all of the rooms. In addition, a temperature control system has been installed in the electrical rooms that reports continuously on actual temperatures. Moreover, the roofs of the electrical rooms have been waterproofed, the rooms have been painted and cleaned, electrical ducts have been refurbished and insulated, and torn electrical cables have been removed. Maintenance of temperatures in the electrical rooms is highly important and is intended to reduce costs in the refurbishment and renewal of electrical and communications infrastructure. A tender was prepared in 2016 for maintenance of the air-conditioners including a special specification that defines the contractor’s work and strict compliance with malfunction repair schedules.

 

Project Details
  • Start Date
  • End Date
  • Cost of the project
  • Work Time
  •   
  •   
  • ₪200,000
  • Approx. 12 months
Projects in progress

Computerized archive

The Association has begun a project to set...

Computerization of engineering drawings

Engineering drawings and paper drawings from the 1950s...

New rag grinder

A rag grinder was installed in 2015 replacing...

New generator

A biological sludge treatment process takes place at...

Installation of sleeves

Extensive maintenance works are being performed in the...

Building renovations

The treatment plant is preparing to renovate and...

Power plant motor coolant piping

The Haifa Wastewater Treatment Plant, operated by the...

Basement ventilation system

Five new aeration fans have been installed for...

Upgrade of the drying and thickening installation

Upgrade of the drying and thickening installation The drying...

Refurbishment of the electricity producing generator

Refurbishment of the electricity producing generator The power station...

Installation of thickening machine

Installation of thickening machine In order to adapt the...

Upgrade of digester tanks

A process of decomposition and stabilization of sludge...

Upgrade of computerized systems

The management system has been upgraded, including Priority...

Replacement of pilot piping in the gas...

The pilot piping in the gas flare has...

Additional projects

Upgrade of sludge conveyors

The conveyors that carry sludge from the sludge...

New generator

A biological sludge treatment process takes place at...

Rehabilitation of the main wastewater collector

The 2 m diameter and 240 m long...
Cookies

This website use cookies to improve site functionality, provide you with a better browsing experience, and to enable our partners to advertise to you.

Detailed information on the use of cookies on this Site, and how you can decline them, is provided in our cookie policy.

By using this Site or clicking on “I agree”, you consent to the use of cookies.

נגישות

  • גודל פונטים

מקרא נגישות

לתאימות מלאה יש להשתמש בדפדפנים כרום ופיירפוקס
למעבר בין אלמנטים בדף לחץ על מקש ה - Tab, לחזרה אחורה לחץ על צרוף המקשים - Shift + Tab

בכלי נגישות זה ניתן לבצע מספר דברים

  • - להחליף צבעוניות של האתר במחלקת הצבעוניות
  • - להגדיל ולהקטין פונטים ללא שבירות עיצוביות
  • - להדגיש כותרות ולינקים בקו מתאר תחתון
  • - ניתן גם לעבוד מקלדת בלבד ולגלוש באתר
  • - ניתן להפעיל מסמך ללא עיצוב כלל
  • - ניתן לאפס הכול לברירת המחדל

ניתן להגיע למקומות עיקריים בקלות ע"י צירופי המקשים הנ"ל

  • ESC מאפס את האינדקס של המסמך ומציב אותו בתפריט ניווט מהיר
  • ALT + i – כיבוי והדלקת מידע זה
  • ALT + m – מעבר מהיר לתפריט הנגישות
  • ALT + s – מעבר לתפריט ניווט מהיר
  • ALT + 1 – חזרה לדף הבית
  • ALT + 2 – מעבר לתפריט הראשי
  • ALT + 3 – מעבר לתוכן המרכזי בעמוד
  • ALT + 4 – מעבר לחיפוש כללי
  • ALT + 5 – מעבר לדף יצירת קשר

במידה ועוברים בין דפים באתר המידע לגבי הבחירות שביצענו נשמר וממשיך עם הגולש אל הדף הבא