Digester Tank No. 1 was emptied and refurbished in 2017. During the refurbishment process, pneumatically-operated gate valves were installed that enable alternate operation of two sludge mixing systems in this tank:
- Mixing of the sludge with inflators
- Mixing of the sludge with gas diffusers at the bottom of the tank
Total project cost: NIS 500,000