New rag grinder

A rag grinder was installed in 2015 replacing the rag filters in the sludge feed piping to the centrifuges. This device improves efficiency in centrifuge operation and improves health conditions for workers.

In the past – the sludge used to be discharged into the centrifuges and the rags were caught in a filter. Once each day, the centrifuges were shut down, workers opened the cover of the filter and extracted the rags.

Now – the rags are milled in the rag grinder and enter the centrifuge with the sludge. The centrifuges operate nonstop as there is no need to extract the rags from the filter.

 

Project Details
  • Start Date
  • End Date
  • Cost of the project
  • Work Time
  •   
  •   
  • ₪110,000
  •   
Mouce on
Projects in progress
Mouce on
post

Computerized archive

The Association has begun a project to set...
post

Computerization of engineering drawings

Engineering drawings and paper drawings from the 1950s...
post

New rag grinder

A rag grinder was installed in 2015 replacing...
post

New generator

A biological sludge treatment process takes place at...
post

Installation of sleeves

Extensive maintenance works are being performed in the...
post

Building renovations

The treatment plant is preparing to renovate and...
post

Power plant motor coolant piping

The Haifa Wastewater Treatment Plant, operated by the...
post

Basement ventilation system

Five new aeration fans have been installed for...
post

Upgrade of the drying and thickening installation

Upgrade of the drying and thickening installation The drying...
post

Refurbishment of the electricity producing generator

Refurbishment of the electricity producing generator The power station...
post

Installation of thickening machine

Installation of thickening machine In order to adapt the...
post

Upgrade of digester tanks

A process of decomposition and stabilization of sludge...
post

Upgrade of computerized systems

The management system has been upgraded, including Priority...
post

Replacement of pilot piping in the gas...

The pilot piping in the gas flare has...

Additional projects

post

Upgrade of air-conditioning systems in the electrical...

An upgrade was performed in 2016 of the...
post

Installation of thickening machine

Installation of thickening machine In order to adapt the...
post

Refurbishment of Digester Tank No. 1

Digester Tank No. 1 was emptied and refurbished...

נגישות

  • גודל פונטים

מקרא נגישות

לתאימות מלאה יש להשתמש בדפדפנים כרום ופיירפוקס
למעבר בין אלמנטים בדף לחץ על מקש ה - Tab, לחזרה אחורה לחץ על צרוף המקשים - Shift + Tab

בכלי נגישות זה ניתן לבצע מספר דברים

  • - להחליף צבעוניות של האתר במחלקת הצבעוניות
  • - להגדיל ולהקטין פונטים ללא שבירות עיצוביות
  • - להדגיש כותרות ולינקים בקו מתאר תחתון
  • - ניתן גם לעבוד מקלדת בלבד ולגלוש באתר
  • - ניתן להפעיל מסמך ללא עיצוב כלל
  • - ניתן לאפס הכול לברירת המחדל

ניתן להגיע למקומות עיקריים בקלות ע"י צירופי המקשים הנ"ל

  • ESC מאפס את האינדקס של המסמך ומציב אותו בתפריט ניווט מהיר
  • ALT + i – כיבוי והדלקת מידע זה
  • ALT + m – מעבר מהיר לתפריט הנגישות
  • ALT + s – מעבר לתפריט ניווט מהיר
  • ALT + 1 – חזרה לדף הבית
  • ALT + 2 – מעבר לתפריט הראשי
  • ALT + 3 – מעבר לתוכן המרכזי בעמוד
  • ALT + 4 – מעבר לחיפוש כללי
  • ALT + 5 – מעבר לדף יצירת קשר

במידה ועוברים בין דפים באתר המידע לגבי הבחירות שביצענו נשמר וממשיך עם הגולש אל הדף הבא