Visitors Center |
Search
|
language
Contact us

Projects

Building renovations

The treatment plant is preparing to renovate and repair buildings constructed decades ago that have deteriorated due to corrosion and wear. Complex works are being performed including the replacement of roofs and walls of the existing structures.

Project Details
  • Start Date
  • End Date
  • Cost of the project
  • Work Time
  •   
  •   
  •   
  •   
Projects in progress

Computerized archive

The Association has begun a project to set...

Computerization of engineering drawings

Engineering drawings and paper drawings from the 1950s...

New rag grinder

A rag grinder was installed in 2015 replacing...

New generator

A biological sludge treatment process takes place at...

Installation of sleeves

Extensive maintenance works are being performed in the...

Building renovations

The treatment plant is preparing to renovate and...

Power plant motor coolant piping

The Haifa Wastewater Treatment Plant, operated by the...

Basement ventilation system

Five new aeration fans have been installed for...

Upgrade of the drying and thickening installation

Upgrade of the drying and thickening installation The drying...

Refurbishment of the electricity producing generator

Refurbishment of the electricity producing generator The power station...

Installation of thickening machine

Installation of thickening machine In order to adapt the...

Upgrade of digester tanks

A process of decomposition and stabilization of sludge...

Upgrade of computerized systems

The management system has been upgraded, including Priority...

Replacement of pilot piping in the gas...

The pilot piping in the gas flare has...

Additional projects

Refurbishment of the main pumping station

The main pumping station is in final stages...

Landscape development at the treatment plant site

Landscape development at the treatment plant site The open...

Improvement of sludge dewatering processes

New sludge dewatering centrifuge A GEA-Westfalia sludge dewatering centrifuge...
Cookies

This website use cookies to improve site functionality, provide you with a better browsing experience, and to enable our partners to advertise to you.

Detailed information on the use of cookies on this Site, and how you can decline them, is provided in our cookie policy.

By using this Site or clicking on “I agree”, you consent to the use of cookies.

נגישות

  • גודל פונטים

מקרא נגישות

לתאימות מלאה יש להשתמש בדפדפנים כרום ופיירפוקס
למעבר בין אלמנטים בדף לחץ על מקש ה - Tab, לחזרה אחורה לחץ על צרוף המקשים - Shift + Tab

בכלי נגישות זה ניתן לבצע מספר דברים

  • - להחליף צבעוניות של האתר במחלקת הצבעוניות
  • - להגדיל ולהקטין פונטים ללא שבירות עיצוביות
  • - להדגיש כותרות ולינקים בקו מתאר תחתון
  • - ניתן גם לעבוד מקלדת בלבד ולגלוש באתר
  • - ניתן להפעיל מסמך ללא עיצוב כלל
  • - ניתן לאפס הכול לברירת המחדל

ניתן להגיע למקומות עיקריים בקלות ע"י צירופי המקשים הנ"ל

  • ESC מאפס את האינדקס של המסמך ומציב אותו בתפריט ניווט מהיר
  • ALT + i – כיבוי והדלקת מידע זה
  • ALT + m – מעבר מהיר לתפריט הנגישות
  • ALT + s – מעבר לתפריט ניווט מהיר
  • ALT + 1 – חזרה לדף הבית
  • ALT + 2 – מעבר לתפריט הראשי
  • ALT + 3 – מעבר לתוכן המרכזי בעמוד
  • ALT + 4 – מעבר לחיפוש כללי
  • ALT + 5 – מעבר לדף יצירת קשר

במידה ועוברים בין דפים באתר המידע לגבי הבחירות שביצענו נשמר וממשיך עם הגולש אל הדף הבא