The Association has begun a project to set...
The project cost
₪100,000
Computerization of engineering drawings
Engineering drawings and paper drawings from the 1950s...
The project cost
₪100,000
New rag grinder
A rag grinder was installed in 2015 replacing...
The project cost
₪110,000
New generator
A biological sludge treatment process takes place at...
The project cost
Installation of sleeves
Extensive maintenance works are being performed in the...
The project cost
Building renovations
The treatment plant is preparing to renovate and...
The project cost
Power plant motor coolant piping
The Haifa Wastewater Treatment Plant, operated by the...
The project cost
₪600,000
Basement ventilation system
Five new aeration fans have been installed for...
The project cost
₪40,000
Upgrade of the drying and thickening...
Upgrade of the drying and thickening installation
The drying...
The project cost
₪2,000,000
Refurbishment of the electricity producing generator
Refurbishment of the electricity producing generator
The power station...
The project cost
₪400,000
Installation of thickening machine
Installation of thickening machine
In order to adapt the...
The project cost
₪1,000,000
Upgrade of digester tanks
A process of decomposition and stabilization of sludge...
The project cost